One Container, Three Locations: Airstream Trailer Delivery Record
One container, three locations
Airstream-style trailers, one 40HQ, one delivery record
Mirror-finish body, service window and twin axle, ready for dispatch
The situation
He was not buying three trailers. He was buying three locations that could open the same day.
The customer in Dublin runs his own food trailer business. Three sites had to open in the same week, so he ordered three units at once — two at 3.7 m and one at 4.0 m — each with a complete kitchen: fridge, gas bottle, range hood, nothing missing.
Three complete equipment sets told us one thing: the three locations operate independently, this is not one main unit with a spare behind it. Nobody buys three kitchen sets for a main-plus-backup order. So the base unit of the plan became one trailer plus one equipment set, not one lump-sum package.
Container first, configuration second. Reverse the order and the box ends up being split at the last moment.
How the plan was calculated
- Check the box first. 3.7 + 3.7 + 4.0 = 11.4 m against a 12.03 m internal length. It fits, so the plan is valid.
- Fix the unit. Three locations, three independent operations: equipment is supplied per trailer, never shared.
- Fix the differences. Only two across the three units: two get an exhaust fan, one gets a drinks fridge.
- Fix the custom items. Service-window orientation follows the site flow, sockets sized to equipment load at 8 per trailer. Locked at drawing stage, no changes after production.
- Fix the delivery. Equipment, tools and wear parts all ship inside the container, so the customer takes delivery and drives straight to site.
Each of the three carries a complete kitchen: 3 × fridge, 3 × gas bottle, 3 × range hood, 2 × exhaust fan, 1 × drinks fridge.
Loading plan: 3.7 + 3.7 + 4.0 = 11.4 m inside a 12.03 m box, 0.63 m left at the tail
Loading, interior lighting and the stainless worktop before dispatch
The loading plan goes to the customer before the contract is signed, and loading day follows that drawing. Three trailers at 2.0 m wide and 2.4 m high fit one 40HQ without an open-top or a second box; the side clearance is used for lashing.
What is inside one trailer
Each of the three carries a complete kitchen. Everything below ships as standard and is installed before dispatch — nothing has to be sourced locally on arrival.
Body & chassis
- Tandem-axle chassis
- Heavy-duty jacks
- Jockey wheel
- Drawbar and coupler
- Anti-slip floor
- Stainless interior and worktop
- Under-counter cabinets
Sales & cash
- Service window, size and orientation per site
- Cash drawer
- 3 pendant lights in the window
- 6 downlights
Water
- 12 V water pump
- Fresh and waste tanks
- Double sink
- Instant-hot tap
- Floor drain
- Fill port
- External fill hose
Power & lighting
- External power inlet
- Surge protector
- 8 sockets per trailer
- Marker lights
- Turn, reverse and brake lights
None of this is optional. Whether a trailer can open on day one is decided by the parts nobody sees.
Double sink, instant-hot tap, external power inlet, drawbar and jockey wheel
Four questions, four decisions
Why insist on one container
- One booking, one customs entry. A single sailing date to plan around.
- One arrival. All three locations take delivery the same day.
- No re-handling. The trailers never move twice at the terminal.
Ask the questions before production, and the rework never happens after it.
How it ships and how it arrives
Each trailer is wrapped and loaded on the same day at the factory, and the container leaves as one unit.