One Container, Three Locations: Airstream Trailer Delivery Record

One container, three locations

Airstream-style trailers, one 40HQ, one delivery record

Dublin, Ireland · 3 food trailers · 1 × 40HQ · ready to open on arrival

Hero image

Mirror-finish body, service window and twin axle, ready for dispatch

3unitsTrailers2 × 3.7 m + 1 × 4.0 m
1x 40HQContainertrailers and equipment together
11.4mLength usedof 12.03 m internal
0.63mTail clearanceone box, no split shipment
01

The situation

He was not buying three trailers. He was buying three locations that could open the same day.

The customer in Dublin runs his own food trailer business. Three sites had to open in the same week, so he ordered three units at once — two at 3.7 m and one at 4.0 m — each with a complete kitchen: fridge, gas bottle, range hood, nothing missing.

Three complete equipment sets told us one thing: the three locations operate independently, this is not one main unit with a spare behind it. Nobody buys three kitchen sets for a main-plus-backup order. So the base unit of the plan became one trailer plus one equipment set, not one lump-sum package.

Container first, configuration second. Reverse the order and the box ends up being split at the last moment.

02

How the plan was calculated

  • Check the box first. 3.7 + 3.7 + 4.0 = 11.4 m against a 12.03 m internal length. It fits, so the plan is valid.
  • Fix the unit. Three locations, three independent operations: equipment is supplied per trailer, never shared.
  • Fix the differences. Only two across the three units: two get an exhaust fan, one gets a drinks fridge.
  • Fix the custom items. Service-window orientation follows the site flow, sockets sized to equipment load at 8 per trailer. Locked at drawing stage, no changes after production.
  • Fix the delivery. Equipment, tools and wear parts all ship inside the container, so the customer takes delivery and drives straight to site.

Each of the three carries a complete kitchen: 3 × fridge, 3 × gas bottle, 3 × range hood, 2 × exhaust fan, 1 × drinks fridge.

Loading plan

Loading plan: 3.7 + 3.7 + 4.0 = 11.4 m inside a 12.03 m box, 0.63 m left at the tail

Loading

Interior lighting

Worktop

Loading, interior lighting and the stainless worktop before dispatch

The loading plan goes to the customer before the contract is signed, and loading day follows that drawing. Three trailers at 2.0 m wide and 2.4 m high fit one 40HQ without an open-top or a second box; the side clearance is used for lashing.

PLAN VIEWAirstream-style trailer set, three units — 12,030 x 2,350 mmTrailer 13,700 x 2,000Trailer 23,700 x 2,000Trailer 34,000 x 2,000Tail630container internal lengthcontainer internal widthThree units in series: 11,400 mm of body inside a 12,030 mm container floor.
Indicative layout — dimensions in millimetres.
03

What is inside one trailer

Each of the three carries a complete kitchen. Everything below ships as standard and is installed before dispatch — nothing has to be sourced locally on arrival.

Body & chassis

  • Tandem-axle chassis
  • Heavy-duty jacks
  • Jockey wheel
  • Drawbar and coupler
  • Anti-slip floor
  • Stainless interior and worktop
  • Under-counter cabinets

Sales & cash

  • Service window, size and orientation per site
  • Cash drawer
  • 3 pendant lights in the window
  • 6 downlights

Water

  • 12 V water pump
  • Fresh and waste tanks
  • Double sink
  • Instant-hot tap
  • Floor drain
  • Fill port
  • External fill hose

Power & lighting

  • External power inlet
  • Surge protector
  • 8 sockets per trailer
  • Marker lights
  • Turn, reverse and brake lights

None of this is optional. Whether a trailer can open on day one is decided by the parts nobody sees.

4systemsBody, sales, water, powerone complete set per unit
23itemsStandard equipmentno extra charge
3setsIndependent kitchenseach unit self-contained

Double sink

Instant-hot tap

Power inlet

Drawbar

Double sink, instant-hot tap, external power inlet, drawbar and jockey wheel

04

Four questions, four decisions

Yes. 3.7 + 3.7 + 4.0 = 11.4 m against 12.03 m internal, leaving 0.63 m at the tail. The loading plan is sent to the customer before loading, and loading day follows it.
Yes. Five equipment types ship per trailer: fridge, gas bottle and range hood on every unit, plus two exhaust fans and one drinks fridge. Each trailer is complete on arrival, with no local sourcing.
Yes, but it has to be decided before drawings. Window orientation drives the service flow, and changing it later means rebuilding the trailer, so size and orientation are confirmed at drawing stage and locked for production.
The body and kitchen are assembled before dispatch: tow it to site, connect power and water, then test. Customs documents (CI, PL, B/L) travel with the container, so nothing is waited on afterwards.

Why insist on one container

  • One booking, one customs entry. A single sailing date to plan around.
  • One arrival. All three locations take delivery the same day.
  • No re-handling. The trailers never move twice at the terminal.

Ask the questions before production, and the rework never happens after it.

05

How it ships and how it arrives

Each trailer is wrapped and loaded on the same day at the factory, and the container leaves as one unit.

40daysProductionfrom drawing sign-off
CIFDublinone box, full documents
12monthsWarrantyfactory covers quality issues

START WITH THE CONTAINER MATH

Send the models and the opening date, the container plan comes first

Tell us how many sites, what trailer length and when you open. We send the loading plan before the price.